The building

A new wood-frame building completed in 2026 on the west side of Montvue Avenue in central Abbotsford, with eight residential suites over a ground-floor commercial unit. Level 1 also holds the residential lobby, an amenity room, and the boiler, storage, sprinkler, and electrical rooms. Levels 2 and 3 are suites. The building is Group C under the Fire Code with a flat membrane roof, Hardie and metal-panel cladding, and a single Schindler elevator serving all floors.

New buildings need a fire safety plan before occupancy, and this one was written from the drawings and a site visit while the finishing trades were still on site, so the owner had an accepted plan ready when the occupancy permit was issued.

What made this plan different

What Abbotsford Fire Rescue Service asks for

Abbotsford requires the plan to be submitted and accepted before occupancy for new buildings, in the Fire Prevention Officers’ Association format with the fire department information section up front, the appointment forms, and drawings showing every exit, extinguisher, shut-off, and fire protection system. Fire drills are required at least annually and the records kept on site.

What the plan includes

Bringing a new building to occupancy in the Fraser Valley? See our Abbotsford fire safety plan page or request a quote.

Need a fire safety plan in Abbotsford?

GetFirePlan prepares CAD-designed fire safety plans accepted by the fire department, with one flat fee and an approval guarantee.

More from Abbotsford

Related guides

Also visit our sister site: FireSafetyPlan.com — Fire Safety Plans for strata and commercial buildings across BC. Building or renovating? See Construction Fire Safety Plans for BC job sites.