18-storey concrete highrise on Jervis Street, Vancouver — fire safety plan prepared by GetFirePlan.com
An 18-storey, 136-suite concrete residential highrise on Jervis Street in Vancouver’s West End — built 1974, fire safety plan updated to BC Fire Code 2018 and approved by Vancouver Fire & Rescue Services.

When the property management team at this Jervis Street highrise contacted us, the building had no current Fire Safety Plan. The existing documentation was outdated — no BC Fire Code 2018 compliance, no structured maintenance schedule, no organized hazardous materials inventory for the pool chemical room.

On the surface this looked like a standard residential highrise file. Once you’re inside the building, it’s anything but.

Here’s how we built the plan from scratch and got it approved by Vancouver Fire & Rescue Services.

The Building at a Glance

StreetJervis Street, Vancouver BC
TypeResidential highrise
Year built1974
ConstructionConcrete with glazing
Floors above grade18 (no 13th floor)
Below-grade levels6 (Parkade P1–P6)
Total suites136

What Made This File Complex

1. A 50-Year-Old Building With BC Fire Code 2018 Requirements

This highrise was built in 1974 — before the current fire code framework existed. Getting a 50-year-old concrete highrise to full BC Fire Code 2018 compliance means auditing systems that have been patched, upgraded, and modified over five decades.

The fire alarm configuration alone is unusual: two separate panels. The Notifier Panel handles elevator recall only and is not connected to any other fire life safety equipment. The main panel — a Model 910D three-wire single-stage alarm — controls full building evacuation. Both panels need clear documentation so any firefighter entering the building knows exactly what they’re working with and what triggers what.

2. Six Below-Grade Levels

Most Vancouver highrises have one or two underground parking levels. This building has six.

That means six levels of evacuation routing, six levels of emergency lighting to test and maintain, and six levels of sprinkler and standpipe coverage — from Level 1 all the way down to Parkade Level P6. The north parkade stairwell exits directly to the exterior; the main building stairwells serve the upper floors. Every route was mapped in the CAD floor plan drawings.

Sprinkler standpipe supervisory valve chained open in Vancouver highrise — fire safety plan compliance
The standpipe system gate valve is chained in the open position — a supervisory valve that must remain open to maintain water flow to the sprinklers. Location, condition, and inspection requirements are all documented in the fire safety plan.

3. Pool Chemical Storage — A Hazardous Materials File Within the File

This building has an indoor pool. That means a pool pump room in the basement and a dedicated chemical storage area: chlorine-free oxidizer, pH Plus, shock treatment, and alkalinity control compounds — stocked in bulk.

Pool chemical storage room in Vancouver highrise basement — hazardous materials documented in fire safety plan
The pool chemical storage area. BC Fire Code requires these materials to be inventoried and documented in the FSP’s hazardous materials section — type, quantity, storage location, and emergency response procedures.
Aqua Brite Plus chlorine-free oxidizer 8kg buckets — pool chemical hazmat inventory, Vancouver highrise fire safety plan
Chlorine-free oxidizer stored in the pool pump room. A building with pool chemicals and no hazardous materials documentation in its FSP is missing a key compliance piece.

4. Emergency Generator With a Decades-Long Maintenance Schedule

The building runs an Onan diesel genset in Parkade Level 2. It supplies emergency power to exit lighting, parkade gates, and the key FOB system — not a system you want failing during an evacuation.

Onan diesel genset in Parkade Level 2 — emergency generator documented in Vancouver fire safety plan
The Onan diesel genset in Parkade Level 2. The “Automatic Unit May Start Now” warning is posted for a reason. The FSP documents a full maintenance schedule: weekly checks, monthly testing, semi-annual contractor service, and milestone inspections at 2, 3, 5, and 10-year intervals.

An emergency generator isn’t just an equipment line in the plan — it’s a maintenance commitment. If the generator isn’t ready when the alarm sounds, people are navigating underground parkade levels in the dark.

5. Fire Department Access and Utility Shutoffs

Every fire safety plan documents what firefighters need to find fast: where to connect, where to shut off, and how to get in. For this building that means four siamese inlet connections on the exterior wall and a gas shutoff at grade — both mapped, photographed, and documented.

Fire department siamese connection inlets on exterior wall — Jervis Street Vancouver fire safety plan
Four fire department siamese connection inlets on the building exterior — location documented in the FSP for responding crews.
Gas shutoff exterior Vancouver highrise — documented in fire safety plan
Exterior gas shutoff — location and access procedure documented so crews don’t search for it during an emergency.

What the Fire Safety Plan Covers

Vancouver Fire & Rescue Services reviewed the plan and issued written approval in October 2022.

Why Older Highrises Need a Fresh Fire Safety Plan

A 50-year-old building isn’t a liability — but outdated paperwork is.

The fire alarm may have been upgraded three times since original installation. The sprinkler system may now cover floors the old plan didn’t document. The pool may have been added after construction. Every change that required a permit should have triggered an FSP review. In many buildings, it didn’t.

If your Vancouver residential highrise hasn’t had its Fire Safety Plan reviewed in the last few years — or you’re not sure when it was last approved by the city — that’s worth knowing before your next fire inspection.

One Flat Fee. Approval Guaranteed.

GetFirePlan.com serves residential strata buildings and property management companies across Vancouver and the Lower Mainland. We draw the floor plans in CAD, write the complete plan, and submit it to the fire department. If it doesn’t get approved, we keep working until it does.

Get a quote for your Vancouver building →


See more Vancouver fire safety plan projects: Fire Safety Plan Vancouver | Fire Safety Plan — Cypress Street, Vancouver | Fire Safety Plan — Regent Medical, West Broadway

Leave a Reply

Your email address will not be published. Required fields are marked *

Also visit our sister site: FireSafetyPlan.com — Fire Safety Plans for strata, construction, and commercial buildings across BC.